Hopkins Foodservice Specialists, Inc.

Consultants to the Best

  • Increase font size
  • Default font size
  • Decrease font size
Home Portfolio Other Project Types Design-Build Phase I: RFP Development Defense Intelligence Systems Agency (Fort Meade, Maryland)

Defense Intelligence Systems Agency (Fort Meade, Maryland)

Defense Intelligence Systems Agency
Fort Meade, Maryland

Prepared RFP package for new building with upscale 24/7 cafeteria to serve 4,272 people. Silver LEED certification

Services: Preparation of RFP for Design-Build Acquisition.

Client: U.S. Army Corps of Engineers, Baltimore District.

Architect: H2―Hellmuth Obata and Kassabaum with HSMM.

“Please accept my congratulations and appreciation for your contributions to this amazing effort.  Getting a full scope award, on time, for $30 million below budget exceeds anything I could have imagined.  ….  A large part of the credit also goes to the quality of the RFP, which all the offerors remarked on during the selection process.  What we have collectively accomplished is a very rare thing in the world of large contracts. Take a minute and give yourself a huge pat on the back for your contribution to this history-making event.  I want to express my appreciation to each and every one of you for your hard work, patience, dedication and professionalism.  DISA looks forward to continuing our productive working relationship and many more successes in the future.” - David R. Bullock, DISA BRAC Executive