Hopkins Foodservice Specialists, Inc.

Consultants to the Best

  • Increase font size
  • Default font size
  • Decrease font size
Home Portfolio Other Project Types Design-Build Phase I: RFP Development Von Braun Center, Redstone Arsenal (Huntsville, Alabama)

Von Braun Center, Redstone Arsenal (Huntsville, Alabama)

Von Braun Center, Redstone Arsenal
Huntsville, Alabama

RFP including bridging documents for a Gold Spirit-rated cafeteria serving 4,000.

Services: Preparation of RFP for Design-Build Acquisition.

Client: U.S. Army Corps of Engineers.

Architect: AECOM.

"Your support for this project has been outstanding.  Thank you for keeping track of this design through the various stages.” 

-John J Wahlers, U.S. Army Corps of Engineers

 

“Very satisfied.  You are doing a great job for us.  I'm glad to have you on our team helping us. Thanks.”

-Ron Kalifeh, PE Project Manager, Redstone Arsenal